24' x 24' Garage Build Part 1 - Here I dig the footing, build the forms for our concrete, laid and bent the rebar, and poured the monolithic slab.
КОМЕНТАРІ: 65
@ronburgundy67602 місяці тому
You lost me when I saw a dump truck full of concrete. 😂
@Bradini2675 місяців тому
awesome job looking forward to the garage build
@srmcontracting5 місяців тому
Thank you, that video should be up in a couple days.
@Abidsalehuk4 місяці тому
Great work and looking forward to see more videos.
@srmcontracting4 місяці тому
Thank you!
@tracymankey93149 днів тому
Amazing job ❤
@jonathanstabley309Місяць тому
Really nice job digging those footings, and forming. I’ve done monolithic pours on smaller jobs like sheds, but never one that big. Great job!
@srmcontractingМісяць тому
Thanks 👍
@josephrottina19015 місяців тому
Good luck brother .👍🏻🇺🇸🇺🇸🇺🇸🇺🇸
@user-vr8gd7eq9s3 місяці тому
Wow! 22k ! lost all my channels when I went premium …glad to find you again and nice garage!
@johnm75545 місяців тому
That concrete will last forever
@georgeballow7028Місяць тому
Contractor poured slab for my addition in 0F temperature. I asked if he was crazy - this is the coldest day in years. Assured me it would be fine. 25 years later not a crack.
@danielcolby72935 місяців тому
20k subs, nice! Maybe do the ramp now…via the dump truck…probably won’t regret it lateron ✌️
@jacobbelfield98355 місяців тому
One thing I do if I hit a rock screwing up my trench is after pulling the stone out, I toss some of the backfill back in and drag the flat side of the bucket to keep it flat. Then I go back over (just one pass) with jumping jack and this helps me sleep at night. But idk anything about keeping concrete in shape.. I build walls on 3/4”
@srmcontracting5 місяців тому
Thanks for the tip, I need to invest in a jumping jack.
@la83092 місяці тому
nice work how much does something like this cost?
@johnmorella31002 місяці тому
Great job! What did the two concrete mixer trucks cost you with delivery?
@AlexeiTetenov4 місяці тому
I'm surprised that you did not put down insulation underneath slab and along the edges to minimize any heat loss.
@scottjackson6385 місяців тому
Great video. Can you explain why plastic is not installed under the beams arounder the perimeter of the foundation? Isn't moisture a problem there too?
@srmcontracting5 місяців тому
Thank you, I'm no concrete expert but I believe the moisture is more of an issue for the slab and not the footings.
@scottjackson6384 місяці тому
@@srmcontracting But the beams around the perimeter are also concrete, which are also subject to moisture wicking up from the soil. In fact, since moisture is most likely to accumulate around the perimeter of the slab from rain and roof runoff, I think moisture is the biggest concern in the area where there is no plastic installed.
@mbrain03Місяць тому
Good Job, I had the concrete calculated at 22 yards assuming your trenches were 12 inches wide
@srmcontractingМісяць тому
There was a lot of over dig because of the rocky soil and that's what threw it off.
@jjtrades7186Місяць тому
Bro did a 3ft foundation. That garage will withstand a direct nuclear explosion lol
@bryanthomas5445 місяців тому
Nice work man I been following for a while. What are your short load fees around there?
@srmcontracting5 місяців тому
Thank you, it's about $400 no matter how many yards you get.
@dlk34744 місяці тому
Why didn’t you vibrate itv
@christiemambourg361522 години тому
How much to build total with high costs of building materials here in Florida. I need an ADU built how much total
@srmcontracting21 годину тому
The whole garage build was about 22k but if your in FL you won't need a slab like this. You should be under 20k for sure. Also a pole barn might be a good option to look into.
@flipthadon42762 місяці тому
How many yards of concrete did you use?
@srmcontracting2 місяці тому
It ended up being 28
@jamescole31525 місяців тому
How many days did you spray the slab?
@srmcontracting5 місяців тому
3 days, after that the temps started dropping so I just left it covered up for about 10 days.
@edisonpaci99224 місяці тому
Man just order 3 trucks
@outfitr97037 днів тому
Set and poured a LOT of monos, never seen one done like that before. Yikes.
@WillByrd-ff9pp4 місяці тому
I got quoted 8500 does that sound correct
@srmcontracting4 місяці тому
That sounds reasonable, materials alone are 5-6k
@fabiancanada88764 місяці тому
I would also guess that the materials are about 6k total. Then you add the exavator and labor for another 2k you end up at around 8000. So I would say 8500 CAD is on the higher end but still ok.
@khodges22 місяці тому
FYI it’s Cubic Yards
@Raffaelo0823 дні тому
He used rocks to support the rebar. 😮 Is that Allowed?
@srmcontracting14 днів тому
Yes
@user-yi6ug2cq3f4 місяці тому
Столько сделали, но плохо что выбиратором не прошли
@bagsjr1Місяць тому
what happens if no vapor barrier?
@srmcontracting21 годину тому
I did plan to put it but I forgot. It's not code for an out building and the building doesn't have HVAC so it's not a big deal.
@jamescole31525 місяців тому
That was some thin plastic.
@Mario.alsanchez1174 місяці тому
🍔 🍔 🍔
@metalrooves36513 місяці тому
that wide footing COST A FORTUNE! !UNREAL ...why wouldn't you use a 6 inch trencher ORlay up a cheap block wall?? WE overkill everything today because everybody is rich......
@umminkug3 місяці тому
It's the stupid code. Unreasonable overkill fits all local building code.
@Mr.SuperDuper-idkМісяць тому
Dump truck 🛻 with concrete. NEXT 😂😂😂
@DarthMeheelos3 місяці тому
норм
@juiceplanet1475 місяців тому
You have to invest in a tripod. Your videos are too short for this genre. Record 3 or 4 hours with sound of machines than edit down to 1 hour. Mix in a little voice over just context. Mute curse words if any. Great for educational purposes & business. Most important, place your business info at the bottom on the video screen. Watermark style. Give free business tees to best comments related to the video. Will help your retention rate and algorithm. Make sure your business info is on them. Cheap investment great for advertisement purposes. #construction #education #machine #building #garage #srmcontracting
@staceymccloud65 місяців тому
I like bro !!!
@salvadorreynoso7809Місяць тому
awesome job, do it once do it right so you don't have to do it again , pay no attention to the nay sayers/know it all
@-mejor-que-nostradamus-6152Місяць тому
99% Of People Wrong Watering Concrete Every Day After Pouring New Slab. Amén.
@dominicchristadore94144 місяці тому
A five dollar ground strap cost you over $1000. I think what you need to do is stick to your concrete business neither that or take a few courses on truck and vehicle repair.
@tysonmayberry120828 днів тому
pretty sad not to know EXACTLY how much concrete you need
@mikew756126 днів тому
Yeah especially 4 yards short
@srmcontracting25 днів тому
The over dig and the rocky soil threw it off big time
@kubota335 місяців тому
He is doing just fine. Do better yourself before telling people how to do things
@billwatcher932119 днів тому
Why on earth would you dig a footing 36 inches?? Huge waste of time and materials.
@mr.ndirangumwaura9936Місяць тому
American foundation work is illegal in most other countries. What a joke
@billwatcher932119 днів тому
Obviously an unlicensed contractor. He doesn't know the building code / doesn't have a clue how deep footings are to be set. And the concrete companies in the area refuse to deliver to him.